Monday, January 23, 2012

Ada bridge crossing


Ada Bridge is the most upstream Belgrade bridge over the Sava river within the urban area. The bridge crosses the tip of Ada Ciganlija island, connecting the municipalities of Čukarica and Novi BeogradThe construction began in 2008 and the bridge opened on 1. January 2012. All adjoining roads are planned to be constructed by 2013.

No comments:

Post a Comment